Compare two renovation quotes on the same scope. Account for VAT, allowances, excluded work and upfront deposits before deciding which offers better value.

Bathroom renovation example

Compare the same scope of work

Edit the example quotes below. Totals include VAT where applicable, allowance gaps, excluded work and your contingency.

Contingency on both quotes
Quote A
Quote B

Quote A

Contractor A — Budget Quote Excl. VAT

Comparable total, including contingency

R116 903

Original quoted amount
R68 500
VAT added
R10 275
Excluded work added
R14 500
PC allowance shortfall
R13 000
Contingency (10%)
R10 628
Upfront contractor deposit
R47 265
Materials bought upfront
R27 500
Total upfront cash needed
R74 765

Upfront cash is 64% of the comparable total. Consider staged milestone payments.

Every scope item has a price or allowance.

Quote B

Lower comparable total

Contractor B — Turnkey Quote Incl. VAT

Comparable total, including contingency

R105 600

Original quoted amount
R96 000
VAT added
R0
Excluded work added
R0
PC allowance shortfall
R0
Contingency (10%)
R9 600
Upfront contractor deposit
R33 600
Materials bought upfront
R0
Total upfront cash needed
R33 600

Every scope item has a price or allowance.

Contractor B — Turnkey Quote Incl. VAT is R11 303 lower on a like-for-like basis.

Original quote difference: R17 225. Resolve any unpriced items before making a final comparison.

Item-by-item scope

Mark each item as included, an allowance, excluded or still unpriced. PC means Prime Cost: a budget for items you still need to choose.

01 · General building

Strip-out, Demolition & Rubble Removal

Quote A · Contractor A — Budget Quote Excl. VAT
Quote B · Contractor B — Turnkey Quote Incl. VAT

02 · Plumbing

Plumbing Rough-in, Waste & Mixer Pipework

Quote A · Contractor A — Budget Quote Excl. VAT
Quote B · Contractor B — Turnkey Quote Incl. VAT

03 · Tiling & waterproofing

Shower & Wet-Zone Waterproofing Membrane

Quote A · Contractor A — Budget Quote Excl. VAT

Added to the comparable total, separate from the original quote.

Quote B · Contractor B — Turnkey Quote Incl. VAT

04 · Tiling & waterproofing

Wall & Floor Tiling — Labour, Adhesive & Grout

Used for both quotes to calculate allowance shortfalls.

Quote A · Contractor A — Budget Quote Excl. VAT

R6 000 below your selection budget. This gap is added to the comparable total.

Quote B · Contractor B — Turnkey Quote Incl. VAT

The allowance covers your selection budget.

05 · Plumbing

Sanitaryware, Taps, Vanity & Shower Screen

Used for both quotes to calculate allowance shortfalls.

Quote A · Contractor A — Budget Quote Excl. VAT

R7 000 below your selection budget. This gap is added to the comparable total.

Quote B · Contractor B — Turnkey Quote Incl. VAT

The allowance covers your selection budget.

06 · Electrical

Electrical, IP65 Lighting, Extractor Fan & Isolator

Quote A · Contractor A — Budget Quote Excl. VAT

Added to the comparable total, separate from the original quote.

Quote B · Contractor B — Turnkey Quote Incl. VAT

07 · General building

Ceiling Skimming & Moisture-Resistant Paint

Quote A · Contractor A — Budget Quote Excl. VAT
Quote B · Contractor B — Turnkey Quote Incl. VAT

08 · Compliance certificates

Statutory PIRB Plumbing CoC & Electrical CoC Sign-off

Quote A · Contractor A — Budget Quote Excl. VAT

Added to the comparable total, separate from the original quote.

Quote B · Contractor B — Turnkey Quote Incl. VAT

Add another scope item

Take your comparison to the contractors

Export the itemised costs and questions to confirm before paying a deposit.

Share:

1. Apples-to-Apples Scope Normalisation

How to Compare Two Bathroom Renovation Quotes on the Same Scope

When two South African contractors quote on the same bathroom renovation, rarely do they format their pricing the same way. One contractor may issue a turnkey quote including 15% VAT, rubble removal, membrane waterproofing, and compliance sign-offs, while another quotes labour-heavy line items excluding VAT and leaves expensive items for you to buy separately.

Common Omissions in “Low” Paper Quotes

  • Rubble Skip Hire & Cartage: Stripping tiles and screed generates 2 to 4 tonnes of rubble that requires municipal skip permits or licensed disposal.
  • Shower & Wet-Zone Waterproofing: Skipping a 2-coat liquid membrane with reinforcing fabric behind shower walls and floor traps causes damp damage in adjacent bedrooms within months.
  • Concealed Plumbing & Electrical Chasing: Moving basin wastes, installing concealed shower mixers, or fitting an IP65 extractor fan is frequently marked “by others”.

How to Normalise Before Signing

  • Check VAT Registration: Verify whether the contractor is a registered SARS VAT vendor and whether the bottom line includes or excludes 15% VAT.
  • Add Back Excluded Trades: Whenever a quote excludes electrical, plumbing, or waterproofing, add an independent trade estimate into that column so both quotes cover 100% of the job.
  • Standardise PC Budgets: Benchmark both quotes against the exact same showroom selection budget for tiles, taps, and sanitaryware.
2. PC Allowances & Provisional Sums

Understanding Prime Cost (PC) Allowances vs. Provisional Sums

Prime Cost (PC) allowances are the single biggest source of bathroom renovation budget overruns. A contractor uses a PC amount as a placeholder for the purchase price of finishes you have not yet chosen—such as porcelain tiles, concealed cisterns, vanity cabinets, mixer taps, and frameless shower glass.

Worked South African Tile Allowance Example (28 m² Wall & Floor Area):

  • Unrealistic Quote Allowance: A contractor allows a PC rate of R150/m² for 28 m² without wastage (R4,200) and excludes tile adhesive, grout, spacers, and aluminium tile edging.
  • Real Showroom Cost: You select a durable porcelain tile at R320/m². Adding 12% cutting and breakage wastage requires 31.4 m² (R10,048), plus R3,500 for porcelain-grade flexible adhesive, water-repellent grout, and brushed trims—totalling ~R13,550.
  • The Hidden Gap: Even before tiling starts, you face a R9,350 out-of-pocket top-up that never appeared in the contractor’s headline quote.
3. Statutory Trade Compliance in SA

When Bathroom Renovations Require Registered Plumbers and Electricians

A general handyman or tiling contractor is not legally permitted to certify regulated electrical or hot-water plumbing installations in South Africa. Skipping statutory compliance can invalidate your homeowner’s building insurance and delay a future property sale when transfer Certificates of Compliance (CoCs) are requested.

  • SANS 10142-1 Electrical Wet-Zone Rules & Electrical CoC: Under the Department of Employment and Labour Electrical Installation Regulations, bathrooms are divided into strict moisture safety zones (Zones 0, 1, and 2). Downlights above showers, extractor fans, heated towel rails, illuminated mirrors, and geyser isolators must meet IP ratings, be earth-bonded, and be signed off with a valid Electrical CoC by a registered electrician.
  • SANS 10254 Geyser & Municipal Water Installation Rules: Relocating or replacing a hot-water geyser, installing a solar or heat-pump system, or altering main water supply and backflow prevention requires compliance with SANS 10254 and municipal water by-laws. Using PIRB-registered plumbers protects your geyser warranty and household insurance cover.
  • Structural Walls & Drainage Changes (NBRBSA Approval): While replacing tiles and sanitaryware in the same position is minor interior work, removing a load-bearing wall, adding a new bathroom, or altering external municipal sewer connections requires approved plans under the National Building Regulations and Building Standards Act.
4. Milestone Payment Schedule

Safe Deposit & Progress Payment Milestones

Never pay 60% to 80% of a renovation quote upfront in cash. Protect both yourself and the contractor by tying progress draws to physical, inspectable milestones in writing:

Stage 1 • 25% – 35% Deposit

Site Establishment & Strip-Out

Or purchase high-value tiles, taps, and sanitaryware directly from the supplier yourself so your materials are on site from Day 1.

Stage 2 • 30% Progress Draw

First-Fix Plumbing, Electrical & Waterproofing

Paid only after concealed pipes are pressure-tested and the shower waterproofing membrane cures before any tiles cover the walls.

Stage 3 • 25% Progress Draw

Tiling, Grouting & Second-Fix Fitment

Paid once wall and floor tiling is complete and the vanity, toilet, shower screen, taps, and light fittings are installed.

Stage 4 • 10% – 15% Final Retention

Snag Sign-Off & CoC Handover

Released only after all rubble is cleared, hot/cold flow and waste drainage are tested, and signed Electrical/Plumbing CoCs are delivered.

Frequently Asked Questions About Comparing Renovation Quotes

Why does one bathroom renovation quote look R25,000 cheaper than another on paper?

In South Africa, a lower headline quote often excludes 15% VAT, leaves out essential scope items (such as rubble skip hire, liquid-applied shower waterproofing membranes, IP65 bathroom electrical fittings, or statutory PIRB and Electrical Certificates of Compliance), or uses artificially low Prime Cost (PC) allowances for tiles and sanitaryware. Once you add back VAT, missing items, and realistic showroom allowances, the cheaper paper quote frequently becomes more expensive.

What is the difference between a Prime Cost (PC) allowance and a Provisional Sum in a South African building quote?

A Prime Cost (PC) allowance is a budget placeholder for the supply price of physical items you still need to choose—such as floor and wall tiles (e.g. R220/m²), taps, a vanity, or a toilet pan—excluding installation labour. A Provisional Sum is an estimated allowance for both labour and materials where the exact scope cannot be confirmed until strip-out (for example, repairing concealed pipework or damp subfloors). If your actual showroom selection exceeds the contractor’s PC allowance, you pay the difference on top of the quoted price.

When do bathroom renovations require a PIRB Plumber or Registered Electrician Certificate of Compliance (CoC)?

Under the Occupational Health and Safety Act Electrical Installation Regulations (SANS 10142-1), any new electrical circuit, relocated isolator switch, heated towel rail, or wet-zone lighting modification requires an Electrical Certificate of Compliance (CoC) from a Department of Employment and Labour registered electrician. Similarly, hot-water cylinder (geyser) replacements or alterations under SANS 10254 and municipal water by-laws require a certified plumber, and moving drainage stacks or load-bearing walls requires municipal building plan approval under the National Building Regulations and Building Standards Act.

How much upfront deposit is reasonable for a bathroom or home renovation in South Africa?

Avoid paying 60% to 80% of the total project value upfront on Day 1. A balanced South African renovation contract typically structures payments in verified stages: a 25%–35% mobilisation deposit (or direct purchase of major sanitaryware/tiles by the homeowner), 30% after strip-out, first-fix plumbing/electrical, and waterproofing flood testing, 25% upon completion of tiling and second-fix installation, and a 10%–15% final retention paid only after the snag list is cleared and valid Plumbing and Electrical CoCs are handed over.